• DSCF2819
  • Dolphin Mooring (32)
Posted by Posted by 0 comments

BERTHING AND MOORING PLATFORM

MEA undertook Engineering, Modelling, Detailing, Supply, Manufacturing, Painting and Assembly of the Berthing/Mooring Dolphin Support Steelwork and Platform, measuring 20 x 20m and weighing over 150 Tons.  This was undertaken on Critical Path over a 3 month period, working over 1800 man hours/week. MEA undertook this work on time, under budget and without any FAI and LTI. Our in-house Quality Procedure for Fabrication and NACE Inspected Painting was all undertaken with zero NCR’s or Quality Issues.