MEA

contact us
Location

5 Soppa Street, Gladstone QLD 4680

(+61) 07 4979 3200

office@mecheng.com.au

Project overview

TUNNEL SCAFFOLD SYSTEM

ClientMultiple tunnels in Brisbane and Sydney

MEA specializes in designing and building motorized tunnel bogie scaffold systems, providing continuous access for workers performing tasks such as waterproofing inside tunnels. This innovative system is specifically engineered to deliver safe, efficient, and uninterrupted access to workers while minimizing disruption to tunnel operations.

The motorized tunnel bogie scaffold is designed to travel through the tunnel using motorized bogies, eliminating the need for constant disassembly and reassembly required with traditional scaffolding systems. This feature allows for easy mobility, ensuring that workers can access all necessary areas within the tunnel without losing valuable time. Despite its size, the scaffold system is designed to allow vehicles to pass through the tunnel, ensuring operational flexibility and access for construction and maintenance vehicles.

Used extensively in the construction of motorway tunnels across Queensland and New South Wales, MEA’s motorized tunnel bogie scaffold system has proven to be a critical tool in maintaining efficient workflows in complex tunneling projects. The system enhances safety, reduces downtime, and improves overall productivity, making it an essential component for large-scale infrastructure projects in the region. MEA’s commitment to innovation ensures that every scaffold system is built to meet the highest standards of durability and performance.