MEA

contact us
Location

5 Soppa Street, Gladstone QLD 4680

(+61) 07 4979 3200

office@mecheng.com.au

Project overview

BOILER ASH HANDLING COMPONENTS

ClientCS Energy

MEA has been a trusted partner for CS Energy over the past 30 years, providing comprehensive design, manufacturing, and maintenance services for power generation boiler ash handling components at both the Callide and Kogan Creek sites. Our deep understanding of the complex nature of the boiler ash handling process has enabled us to continuously improve and maintain critical components, ensuring optimal performance and reliability.

We have been involved in a wide range of projects, including the design and manufacture of SCC Chain Conveyor systems, Ash Pug Mixer units, SCC Drive Units, Ash Mixing Paddle shafts, and elevator bucket pulleys. Each component is designed with precision and built to handle the demanding conditions of power plant operations, ensuring long-lasting durability and efficiency.

In addition to mechanical and fabrication works, we provide ongoing maintenance services to ensure that these essential components remain in peak condition throughout their lifecycle. Our ability to address the unique challenges of power generation facilities allows us to develop tailored solutions that improve the efficiency and longevity of equipment, minimizing downtime and maximizing operational output. MEA’s expertise and commitment to quality make us a key partner in supporting the continued success and reliability of CS Energy’s boiler ash handling operations.